Juvent - Wind farm 4+

BKW Energie AG

    • Free

Screenshots

Description

Experience the Juvent Wind farm and get live information about the wind turbines and the current alarm events.

With 16 wind turbines, the wind farm on the Mont-Crosin and Mont-Soleil in the Bernese Jura is the biggest and oldest of Switzerland.
Its history began in 1996 with the construction of the first 3 wind turbines on the Mont-Crosin, close to the existing solar plant by Juvent SA, a subsidiary of the energy and infrastructure company BKW.
After multiple extensions, the wind farm currently consists of 16 wind turbines.
With a yearly production of about 70 GWh, the wind farm can supply more than 15'000 households with wind power.

Main app functionalities:
- Turbines overview on an interactive map
- Live production data of the wind farm
- Detail overview of the power, ambient temperature, wind speed, wind direction of each individual turbine
- Chart of the produced power over the last 48 hours
- Notifications in case of lightning, storm or ice fall/ice throw risk
- Announcements on the home page

What’s New

Version 3.0.2

Complete redesign of the app:
- New design
- New interfaces for the turbines data
- Compatibility with the latest operating systems versions

App Privacy

The developer, BKW Energie AG, indicated that the app’s privacy practices may include handling of data as described below. For more information, see the developer’s privacy policy.

Data Not Collected

The developer does not collect any data from this app.

Privacy practices may vary, for example, based on the features you use or your age. Learn More

More By This Developer

You Might Also Like

aliunid MONITOR
Utilities
aliunid HOME
Utilities
WEO Windenergie Online
Utilities
Energy Forecast
Utilities
WONDER onSITE
Utilities
aliunid PROVISIONER
Utilities