Landlords Electrical Checklist 4+

Pro Certs Software Ltd

Conçu pour iPad

    • Gratuit
    • Inclut des achats intégrés

Captures d’écran

Description

This Landlords electrical interim checklist details what to look for to carry out an interim inspection. Split into easy to follow sections, once each task is completed you can select the checklist item item as passed (tick), failed (X) or N/A if not applicable.

Suitable for single-lets, HMO's and serviced accommodation.

Each interim checklist item describes what to look for for each section / item of the checklist.

This Landlords Interim Electrical Visual Inspection Checklist app solves the issue of providing evidence that the electrical installation is maintained and kept in a safe working order throughout a tenancy, a requirement of the new PRS scheme (Private Rented Sector).

At the end of the inspection you can save, print or email a PDF report of the routine check for your records.

Features:-
Easy to follow checklist
Save, print and email PDF reports
Sign and date reports
Add your own comments

The electrical checklist is split in to 8 easy to navigate sections:
1) Property Details
2) Paperwork
3) Consumer Unit
4) Sockets and Switches
5) Lights
6) Smoke, Heat and Carbon Monoxide Alarms
7) General
8) Additional Comments

With the new mandatory 5 yearly electrical installation condition report ( EICR ) for private rental properties (PRS) is it more important than ever to keep records of these checks for future reference should anything go wrong.

To ensure an electrical installation is continually maintained and kept in a safe working order for continued use a 5 yearly Electrical Installation Condition Report should be carried out at least every 5 years by a suitably skilled electrician, in addition to this an Interim Electrical Visual Inspection should be carried out at least every 12 months and at change of tenancy which is what this app serves.

In addition to having a 5 yearly Electrical Installation Condition Report (EICR) carried out, an Interim Visual Electrical Inspection should be carried out at least every 12 months and at change of tenant.

> Electrical Installation Condition Report: Max 5 yearly,
SOLUTION = "Pro Certs" Electrical Certification App

> Interim Electrical Inspection: 12 months / change of tenancy (which ever comes first),
SOLUTION This "Landlords Electrical Checklist" App

BS 7671 Wiring Regulations recommend an interim electrical inspection (routine check) is carried out at least every 12 months for all rental properties or at change of tenancy (which ever comes first).

Download the Landlords Electrical Checklist app today and start generating your electrical interim inspection reports.

Terms of use:- https://www.procertssoftware.com/terms-of-use
Privacy policy:- https://www.procertssoftware.com/privacy-policy
Contact support:- https://www.procertssoftware.com/contact

Nouveautés

Version 1.0.10

- New items added to the electrical checklist.
- PDF certificate design update.
- Updated app icon.
- UI tweeks.
- Bug fixes.

Confidentialité de l’app

Le développeur Pro Certs Software Ltd a indiqué que le traitement des données tel que décrit ci‑dessous pouvait figurer parmi les pratiques de l’app en matière de confidentialité. Pour en savoir plus, consultez la politique de confidentialité du développeur.

Données non collectées

Le développeur ne collecte aucune donnée avec cette app.

Les pratiques en matière de confidentialité peuvent varier, notamment en fonction des fonctionnalités que vous utilisez ou de votre âge. En savoir plus

Du même développeur

Watts Amps Volts  Calculator
Productivité
kVA Calculator
Utilitaires
Ohms Law
Utilitaires
R1+R2 Zs Ze Calculator
Utilitaires
Power Capacitors
Utilitaires
Cable Calc
Productivité

Vous aimerez peut-être aussi

CertSuite
Utilitaires
Cableboss
Utilitaires
SGW 5D PAT Testing
Utilitaires
Megger Link
Utilitaires
Fire Risk Assessment App
Utilitaires
TrustMark: Home Improvements
Utilitaires